للتسجيل اضغط هـنـا
#1
|
||||
|
||||
C**DENSER – AIR EXTRACTI** EQUIPMENT ( 1 Of 3 )
- Turbines are designed for a particular operating c**diti**s like steam inlet pressure, steam inlet temperature and turbine exhaust pressure/ exhaust vacuum, which affects the performance of the turbines in a significant way. Variati**s in these parameters affect the steam c**sumpti** in the turbines and also the turbine efficiency. Theoretical turbine efficiency is calculated as work d**e by the turbine to the heat supplied to generate the steam. - Higher exhaust pressure/ lower vacuum, increases the steam c**sumpti** in the turbine, keeping all other operating parameters c**stant. Exhaust pressure lower than the specified will reduce the steam c**sumpti** and improves the turbine efficiency. Similarly exhaust vacuum lower than the specified, will lower the turbine efficiency and reduces the steam c**sumpti**. - The air extracti** EQUIPMENT must be capable of meeting two c**diti**s; **e met during normal operati**, the other when raising vacuum ** the turbo-generator unit. - When raising vacuum the air extracti** equipment must deal rapidly with a large quantity of air and sufficient capacity must be installed to reduce pressure quickly in the C**DENSER to a level which allows the turbine to be started. The last row blades of a 500 MW turbine will overheat if they run at speed and at low load in a poor vacuum. Thus, a vacuum of 20 in.Hg must be obtained before steam is admitted to the turbine and a vacuum of 26 in.Hg for full speed. It is important that the time taken to bring a turbo-generator ** load shall not be increased by sufficient air extracti** capacity. - Under normal operating c**diti**s the quantity of air to be exhausted is lower. It c**sists of air leakage into the c**denser via flanges and glands and also of inc**densable gases that are present in the steam exhausting from the turbine. Air and inc**densable must be removed from the c**denser as their presence in any quantity impairs the heat transfer capability of the c**denser and hence its performance. C**versely, excessive air extracti** capacity should not be run, as this involves unnecessary running costs and also results in the extracti** of an unwanted quantity of water vapor from the c**denser steam space.
شارك إعجابك بالموضوع --»
__________________
|
#2
|
|||
|
|||
مشكور على الكتاب
|
العلامات المرجعية |
الكلمات الدلالية (Tags) |
condenser, equipment, extraction |
|
|
المواضيع المتشابهه | ||||
الموضوع | كاتب الموضوع | الأقسام الرئيسية | مشاركات | المشاركة الاخيرة |
Ge: Ac speed c**trol equipment | qjjiijiqjiij | قسم الألكترونيات الصناعية و التحكم فى الآلآت الكهربية | 0 | 10-11-2014 07:37 AM |
C**denser Ball Cleaning System _ Update | Khaled Hamza | توليد الطاقه الكهربية والتحكم بها | 4 | 08-21-2011 04:43 PM |
C**denser ball cleaning system | Khaled Hamza | توليد الطاقه الكهربية والتحكم بها | 2 | 08-17-2011 11:11 PM |
Lv switchgear and equipment | qjjiijiqjiij | قسم صيانة المعدات الخاصة بمحطات التحويل Switchgear | 8 | 08-09-2011 03:48 PM |
Electric safty equipment | qjjiijiqjiij | قسم هندسة الجهد العالى | 10 | 08-06-2011 02:48 AM |