Lightbulb Load Rejecti** Test (Governor Test)

Load Rejecti** Test (Governor Test)


The purpose of Turbine Load Rejecti** Test is to verify and dem**strate the governor functi** to sustain a load rejecti** in order to prevent the turbine from overspeed tripping, steady speed c**trol at no-load operati** and remain in service without any adverse effect to the turbine.
The test requires skillful and appropriate operati** not **ly for turbine , but also for boiler and its auxiliaries.
































Items to be c**firmed for Load Rejecti** Test
1-Turbine main valves
2-GV no load valve positi**
3-Lube oil pump auto start test
4-Protective device test
5-Valve transfer from MSV mode to GV mode
6-Overspeed tripping point (111% speed)
7-OPC (Overspeed Protecti** C**troller) functi**
8-Exclusi** of Interlocks (Turbine Trip due to Boiler Trip)


TEST PROCEDURE

*Before Load Rejecti** Test (**e hour)
1-C**firm steady c**diti** of load operati**
2-Perform mechanical Over Speed Oil trip Test
3-Perform Lub. oil pump auto start test
4-change over unit auxiliary bus from unit auxiliary transformer to start up transformer.


*Before Load Rejecti** Test (30 minutes)
1-C**firm that level of( C**denser , De aerator and HP/LP feed water heaters are ****** range
2-c**firm that AVR in automatic mode
3-C**firm that HP and LP Turbine bypass ( valves and Sprays ) are in automatic mode

*Before Load Rejecti** Test (10 minutes)
1-c**firm the appointed time with the load dispatcher
2- Exclude the interlock of (Turbine Trip due to Boiler Trip)

*Before Load Rejecti** Test (0 minute)
1-Open Circuit breaker of the Generator.
2-If the Overspeed trip device doesn't operate c**trary to expectati**s even when the turbine speed exceeds 111% of the rated speed , Trip immediately the turbine.
3-All observers shall read and record "Maximum or Minimum" of the measuring objects during transient c**diti**






After Load Rejecti**
Pay attenti** to the following points and see that there is no distincti** about them.
-Turbine speed
-Rotor Positi** & Vibrati**
-BRG temp. and Vibrati**
-C**denser Vacuum and hotwell level



Stabilizati**
-Stabilizati** will be judged when turbine speed is stabilized approx. 3000 rpm by GV & ICV speed c**trol




Test Acceptance Criteria
If maximum instantaneous speed is restricted below overspeed trip limits (111 %) ,therefore the load rejecti** test is regarded as successful.




C**firmati** items after Stabilizing
-GVs are restored in no load positi**
-turbine speed is c**trolled at near synchr**ous level
-No abnormality is observed at electrical room and local positi**s.






Emergency Case
If boiler trips by boiler protecti** , turbine shall be immediately tripped.


Google+

شارك إعجابك بالموضوع --» 

رد مع اقتباس
  #2  
قديم 08-12-2011, 06:08 AM
عضو مميز
 
تاريخ التسجيل: Aug 2011
الدولة: مصر
المشاركات: 1,187
معدل تقييم المستوى: 14
bigleve2100 is on a distinguished road
افتراضي

مشكور على الكتاب


رد مع اقتباس
  #3  
قديم 04-24-2012, 12:28 PM
عضو متألق
 
تاريخ التسجيل: Dec 2010
الدولة: مصر
المشاركات: 320
معدل تقييم المستوى: 14
alan_sherar88 is on a distinguished road
افتراضي

مشكووووووووووووووووووووووووور حبيبي


رد مع اقتباس
إضافة رد

العلامات المرجعية

الكلمات الدلالية (Tags)
(governor, load, rejection, test, test)


ضوابط المشاركة
لا تستطيع إضافة مواضيع جديدة
لا تستطيع الرد على المواضيع
لا يمكنك اضافة مرفقات
لا يمكنك تعديل مشاركاتك

BB code is متاحة
كود [IMG] متاحة
كود HTML معطلة
Trackbacks are متاحة
Pingbacks are متاحة
Refbacks are متاحة

المواضيع المتشابهه
الموضوع كاتب الموضوع الأقسام الرئيسية مشاركات المشاركة الاخيرة
Cctv c**tinuity test aymaneltonsycourses فيديوهات يوتيوب الهندسية 0 05-19-2016 05:16 AM
Test your knowledge about PLC Automati** qjjiijiqjiij قسم المحركات الكهربية و دوائر التحكم PLC ا 0 03-05-2013 09:47 AM
ملف من شركة sebakmt test van qjjiijiqjiij قسم خطوط النقل والتوزيع:: الكابلات الارضيةوالخط 0 01-27-2013 03:53 PM
Cable Test Set KMK 7 qjjiijiqjiij قسم خطوط النقل والتوزيع:: الكابلات الارضيةوالخط 0 01-14-2013 12:31 PM
Megger Test Procedure qjjiijiqjiij قسم الانشاءات الكهربية 0 12-21-2012 11:18 AM


الساعة الآن »11:13 PM.


Powered by vBulletin® Version 3.7.5
.Copyright ©2000 - 2024, Jelsoft Enterprises Ltd
3y vBSmart
F.T.G.Y 3.0 BY: D-sAb.NeT © 2011