السلام عليكم ورحمة الله وبركاتة
Presentati** Overview
• General informati** about Abu Dhabi
• The Transmissi** system
– Current situati** and forecasts
– Undergrounding policy
• Main Specificati**s for underground
Cable systems
• Projects already Commissi**ned by Silec Cable (132 kV and 220 kV)
– Mussafah -> ICAD
– Yas Island
• Projects **going by Silec Cable (132kV)
– Raha Beach
• Project coming for Silec Cable (132kV)
– Sowa, Al Reem, Yas Islands
• Coming Projects at 400kV
– C**structi** issues
– Cable and Accessories design and type testing
– Thermal m**itoring
– Requirements from the operator for a Dynamic Thermal Rating system
• C**clusi**s
منقول